Mode:  
   
 
Building Department News

DO NOT allow your contractor to unload dirt, gravel, bricks or any other building material in the street, driveway apron or berme between the sidewalk and the curb.  On numerous occasions this year, building material was deposited in the street, causing the police to contact the homeowner/contractor to immediately remove the material. If the material is not removed within two hours, the City has the material removed by a private contractor at the homeowner's expense.

Building material, including dirt, gravel, bricks, etc., 
MUST BE UNLOADED AND STORED ON THE HOMEOWNER'S PROPERTY.

Print  
Building Department Links
Print  
Building Department

 
Throughout the year, the Building Department issues permits for building construction, plumbing, heating, mechanical and electrical work.  The fee for Building Permits is based on the value of the work.  For example, a project with an estimated value of $1000.00 will require a building permit fee of $55.00, which is the minimum fee.  Other trade permits are based on the type and quantity of work, not on the value of the work.  There are many different contractors who regularly work in the City and the estimated cost and value of each job varies with each contractor.  The City does not question the cost or value of the work unless there is reason to believe the cost is extremely high or low.  If that occurs, the Building Official requires a copy of the contract to verify the cost.  contact City Hall at 248-541-2900 for more information.

Print  
 



download free wordpress themes
       
     Login  
Copyright 2007 by City of Pleasant Ridge    Terms Of Use   Privacy Statement